Products Description

This is 2-Layer Polyester ribstop pongee taffeta fabric with P/D+DWR+PU milky coating WP/MVP: 3K/3K and meet with ISO 811/ASTM E96 BW95 ,its face material is a super thin Polyester ribstop pongee fabric with water-repellent finish,its back material is PU milky coating WP/MVP: 3K/3K.It is water and wind resistant,waterproof,breathable,durable,ideal for Leisure wear, outerwear, windproof jacket,Anti-UV jacket,etc.

Category: raincoat, outerwear, windproof jacket

 

1)Article No.: G+A 00042

2)Description: 2-Layer Polyester ribstop pongee P/D+DWR+PU milky coating WP/MVP: 3K/3K used for Leisure wear, outerwear, windproof jacket,Anti-UV jacket etc.

  • Material:
    Face Material: 100% Polyester ribstop pongee 75D*75D  P/D+DWR

Back Material:PU milky coating WP/MVP: 3K/3K

4)Width: Cuttable 57”
5)Weight: 140GSM +/-5%

6)Finishing: P/D+DWR+PU milky coating WP/MVP: 3K/3K

7)Sample policy: A4 sample available by free,but courier fees at your cost

8)Note: We make to order, welcome to receive your original quality samples and color sample to produce and make L/D accordingly.For the difference of camera and browser, the colour might not be shown accurately in picture.

9)Feature: Waterproof,Windproof,Breathable,Abrasion Resistant,High visibility

10)Technical information:

Resistance to Water Penetration (Hydrostatic Pressure Test): ≥3,000mm H2O before Washing (ISO 811)
Water Vapour Transmission: ≥3,000g/m2/24Hrs before washing (ASTM E96 BW95)
Resistance to Surface Wetting (Spray Test): ≥Class 4 (ISO 4920)
Water Resistance (Rain Test): <1g (ISO 22958)
Colour Fastness to Washing: Discoloration≥Class 4, Staining≥Class 3 (ISO 105-C06)
Colour Fastness to Light: Discoloration≥Class 4 (ISO 105-B02)
Reach / OEKO-TEX100 Annex 6, product class I./EN 343 Class4

11)Appication: Leisure wear, outerwear, windproof jacket,Anti-UV jacket

12))Quality Control System :
Fabric in every step (Greige,Dyeing and Finising) must be checked,and every dye lot or finishing lot must be tested in our laboratory or other authorities,we promise only ship goods with good quality.

13)Package: Standard Export Packing by 12 sets of Automatic Packing Machines imported from Taiwan

14)Moq.: 1,000meters / color

15)Lead Time: 20-30days average from receiving sight L/C or 30% deposit

16)Payment Terms: 1)L/C at sight  2)30% deposit,and balance against B/L copy

 

Send a inquiry

8 + 6 =